Environmental
- Complete Environmental Study Reports for all engineering projects during preliminary design stages to M.O.E. standards.
- Sarnia Refinery Water Pollution Control Plant for Esso Petroleum and Esso Chemical Pollution Control Plant upgrade (Area 3).
- Air Pollution Control Plant including Scrubber Effluent Treatment for Holmes Foundry.
- Earth Fill Dam, Recreational Lake, Beach Reclamation, Access Roads, Parking, Boat Launching Ramps for St. Clair Region Conservation Authority.
- Docking Facilities and Workshops for St. Clair River Oil Spill Recovery Equipment for Bluewater Clean.
- Cabot Carbon Storm Drainage Pollution Control System including collection and storm effluent treatment.
|